Osisko notes excellent flotation tests of samples from Pine Point

Pine Point lead-zinc project. Image courtesy of Osisko Metals

Montreal-based Osisko Metals has the results of flotation tests on material from its Pine Point zinc-lead project 65 km east of Hay River, in Canada’s Northwest Territories.

The tests were performed on drill core samples from the 2018-19 campaign that were pre-concentrated using an x-ray transmission material sorter.

Optimized rougher flotation tests recovered 95.3% to 97.7% of the zinc, compared to 80.4% to 91.5% in the first tests done. Likewise, optimized cleaner tests had zinc recoveries between 93.1% and  94.5%, compared to initial recoveries of 83.9% to 87.7%.

The optimized lead rougher had recoveries of 96.7% to 97.4%, compared to previous work that recovered 97.5% to 99.0% of the lead. Optimized  lead cleaner recovery was 87.4% to 92.4%, compared to initial recoveries of 92.2% to 95.9%.

After optimization, the zinc cleaner produced a concentrate that graded 64.1% zinc and 0.3% lead. The lead cleaner product was 1.2% zinc and 91.4% lead.

The Pine Point project has an inferred resource of 38.4 million tonnes at 4.58% zinc and 1.85% lead, containing 3.9 billion lb. zinc and 1.6 billion lb. lead.

(This article first appeared in the Canadian Mining Journal)

Comments

Your email address will not be published. Required fields are marked *

No comments found.

{{ commodity.name }}

Contest Ranking Modal BG Contest Ranking Modal BG
Contest Ranking Title

The new Mining Power Rankings are live. Vote for the sector’s leaders in each of the Large-, Small-, and Micro-Cap leagues.

Vote Now